WEATHER WORKING DAY

A working day or part of a working day during which it is possible (if the vessel is loading / discharging) to load of discharge the cargo without interference due to weather. If such interference occurs (or would have occurred if work had been in progress) there shall be excluded from lay time a period calculated by reference to the ratio which the duration of the interference bears to the time which would have or could have been worked but for the interference.